Home / Manpower Supply / Duct fitter supply in the UAE
Duct fitter and sheet metal supply
Duct fitters, sheet metal workers and ductwork erection gangs supplied to MEP contractors and industrial ventilation projects across the UAE.
Duct fitters, sheet metal workers and ductwork erection gangs supplied to MEP contractors and industrial ventilation projects across the UAE.
Ductwork is bulky, awkward and installed in the most congested part of the ceiling void, usually after the services that were easier to fix first. A duct crew that can read coordinated drawings and hang to level without clashing into the sprinkler and cable tray routes saves an argument on every floor.
NSTC supplies duct fitters for installation and sheet metal workers for fabrication, and we grade them separately because they are different skills. Fabrication is workshop accuracy; erection is site coordination.
Duct crews commonly work alongside our HVAC technicians and electricians on MEP packages, which keeps the interfaces inside one supplier rather than across three.
| Role | What the grade covers |
|---|---|
| Ductwork supervisor | Runs the erection crew from coordinated drawings, manages levels, clash resolution and inspection with the main contractor. |
| Chargehand duct fitter | Leads a gang, sets out hanger positions and levels, checks jointing and sealing before the section is closed up. |
| Duct fitter (erector) | Ductwork assembly, hanging, jointing, sealing and fixing of dampers, grilles and diffusers to drawing. |
| Sheet metal worker | Workshop fabrication of ducting, fittings, transitions and bends, including cutting, forming and seaming. |
| Insulation applicator | Duct insulation, vapour barrier and cladding following the erection crew. |
| Ductwork helper | Material handling, hoisting, access support and housekeeping around the erection gang. |
Tell us the quantity, the site and the start date. We reply with availability and grades, and can have workers on your site within 24 hours.
+971 56 508 5290Mobile and WhatsApp, Mon to Sat
Request ManpowerOr email info@nastechnical.com
Ductwork installation across towers, offices and retail, working to the coordinated services drawings.
High-density duct routes in guest floors and back-of-house, where ceiling void space is tight.
Process extraction, fume and ventilation ducting in factories, workshops and plant buildings.
Commercial kitchen extract systems, including fire-rated ducting and access panel installation.
Large-section supply and extract ducting in basement and podium car parks.
Sheet metal fabrication of ducting, fittings and transitions to project drawings.
Trade, quantity, site, start date, duration and any certification you need.
Availability, worker grades and commercial rates come back to you.
Review the profiles and issue a purchase order or letter of acceptance.
Workers arrive with documentation complete and a named crew lead as your contact.
Tell us the scope, the crew size and the programme. We confirm availability and rates, and can mobilise within 24 hours.