Storage tank fabrication and installation

Atmospheric storage tanks for process fluids, firewater, fuel and chemical service, with bottom plate, shell and roof welding, standard NDT and hydrotest.

NSTC fabricates and installs atmospheric storage tanks for process fluids, firewater, fuel and chemical service. The scope runs from bottom plate through shell courses to the roof, with the welding, testing and documentation that the handover needs.

Third-party inspection is coordinated against your TPIA hold points, and those hold points are agreed before fabrication starts rather than discovered halfway up the shell. That single step is what keeps a tank programme from slipping.

The erection crew, the welders and the coating operators all come from the same roster, so a tank can be fabricated, erected and coated without handing the scope between subcontractors.

Specification

ItemWhat we work to
Tank typesAtmospheric storage, chemical service, firewater and fuel day tanks
ScopeBottom plate, shell courses, roof, nozzles and internals
WeldingQualified procedures with welder records supplied before work starts
TestingStandard NDT and hydrotest
InspectionThird-party coordinated against your TPIA hold points
Associated worksBunds and containment, and protective coating where the scope includes it

What the scope includes

  • Hold points agreed with your inspection body before fabrication starts.
  • Bottom plate laying, shell course erection and roof fitting.
  • Nozzle setting, internals and appurtenances to the drawing.
  • NDT and hydrotest, with reports issued for the handover dossier.
  • Bund and containment works where they form part of the scope.
  • Surface preparation and protective coating, taken from our own coating crew.

Need a price for tank fabrication?

Send the drawings or the scope of work. We come back with a method, a programme and a price.

+971 56 508 5290

Mobile and WhatsApp, Mon to Sat

Request a Quotation

Or email info@nastechnical.com

Inspection
Hold points agreed before start
Emirates
Sharjah, Dubai and Abu Dhabi
Systems
ISO 9001, 14001 and 45001

Tanks we build

Atmospheric storage

Process fluid storage on industrial and plant sites, sized and detailed to your drawings.

Firewater tanks

Storage for fire systems, tested and documented for handover to the authority having jurisdiction.

Fuel day tanks

Smaller service tanks for generator and plant fuel, fabricated and set in position.

Chemical service

Tanks in material grades suited to the stored product, with coating systems specified to match.

How to request tank fabrication

1

Send the requirement

Trade, quantity, site, start date, duration and any certification you need.

2

We confirm

Availability, worker grades and commercial rates come back to you.

3

You approve

Review the profiles and issue a purchase order or letter of acceptance.

4

Crew mobilises

Workers arrive with documentation complete and a named crew lead as your contact.

Common questions

Do you coordinate third-party inspection?
Yes. We agree the hold points with your nominated TPIA before fabrication starts and work to them through bottom plate, shell, roof and testing. Agreeing them in advance is deliberate: a hold point discovered part way up the shell is the most common cause of a tank programme slipping.
Can you coat the tank as well as build it?
Yes. Surface preparation to Sa 2.5 and application of the protective system runs from our own coating crew rather than a subcontractor, so the blasting and painting sit inside the same scope and the same programme.
Do you take the civil works and bund as well?
Bunds and containment can be included where they form part of the tank scope. Foundation design and major civil works are normally held by your main contractor, and we work to the foundation as issued.

Send the tank drawings and hold points

We come back with a method statement, a programme and a price, with inspection agreed up front.